————————————————–

————————————————–

Projects & Work

Current Location
Current Location
Near Madisonville, TX -[..]
Projects
Projects
Project listing of SoilMovers[..]
Country Lake Showcase
Country Lake Showcase
You have a dream,[..]

————————————————–

If you dream it, we can build it.....


SoilMovers LLC -- Nick Jones.

Bremond, Texas USA

Working throughout Texas and Oklahoma

Professional Excavation Services

Professional Project Consultations

Specializing in Trophy Fishing Lakes, Recreation Ponds and Rural Lake Retreats.


————————————————–

Quality excavation work is almost always forever.

About Us
About Us

A Successful Track Record

Nick[...]
Contact Nick
Contact Nick
The first step[...]
Expert Consulting
Expert Consulting
Choosing an effective consultant[...]
Services
Services
SoilMovers LLC available services,[...]
References
References
Big important jobs usually[...]

————————————————–

Contact Nick. All submitted info is private.


————————————————–

Trophy Fishing Lakes

If you want to catch a good fish then you need to build a good fishing lake.

A plastic lake liner is the ultimate fishing and recreation lake construction method

.

We are experts in the design and construction of trophy fishing lakes utilizing a plastic lake liner.

————————————————–

Oakwood Trophy Fishing Lake

This fishing lake project was built on a first class working cattle ranch of over 17,000 acres in Central Texas. Situated in the flood plain of the Trinity River, it provided a great location to construct a first rate trophy fishing lake for our client. The clients had a cut off of the Trinity River in their backyard that was used for jet skiing and other water recreation.  They had grown frustrated because it was just not a really great fishing location.

 

The lake building project encompassed just about every aspect of building a world class fishing lake. It was high profile since it was to be constructed directly in front of the ranch owner’s weekend retreat. The lake building project presented site challenges and soil suitability problems which led us to recommend a plastic liner. Just to add a little more to the mix, the lake construction project was also in the path of Hurricanes Gustaf and Ike!  The chronological pictures and descriptions explain the lake construction project in greater detail.  You can see how the trophy lake was stocked with feeder fish here.

(Click any picture to enlarge it.)

 


 

 

 

Related Posts Plugin for WordPress, Blogger...
Related Images:

Comments are closed.