Arrows point to the 650 acre tract |
|
|
|
|
|
|
|
|
|
|
|
|
650 acre tract partially outlined in red. |
|
The arrow points to the RV parking area. The lake will be placed in one of the hardwood erosion management areas which appear as taller trees. |
|
|
|
|
|
|
|
|
|
|
Access road cut into the piney woods along with right of way for underground utilities. |
|
|
|
|
|
|
|
|
|
|
|
|
Trails are cut through the thick brush to allow for exploration and future access |
|
|
|
|
|
|
|
|
|
|
|
|
The trails allow us to narrow down the most suitable area for lake construction. |
|
|
|
|
|
|
|
|
|
|
|
|
With over 4 miles of trails cut through the property, the owner can evaluate and explore in areas previously inaccessible. |
|
|
|
|
|
|
|
|
|
|
|
|
Test holes are then dug in desirable areas to determine soil suitability. |
|
|
|
|
|
|
|
|
|
|
|
|
Land clearing begins once the site for the recreational lake is determined. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
An excavator speeds the process of clearing the larger trees. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Additional test holes are dug in the proposed lake area to make sure heavy clay soil is present. |
|
|
|
|
|
|
|
|
|
|
|
|
Digging the core trench for the dam |
|
|
|
|
|
|
|
|
|
|
|
|
The recreational lake begins to take shape. |
|
|
|
|
|
|
|
|
|
|
|
|
The RV Basecamp. The property owner has moved his trailer in to this location and spends many weekends here as the lake construction progresses. |
|
|
|
|
|
|
|
|
|
|
|
|
An aerial view of the future recreational lake site with about 3 acres cleared. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Aerial view as the large recreational lake nears completion. Lake surface area is around 7 acres. |
|
|
|
|
|
|
|
|
|
|
|
|
Aerial with earthen dam in foreground. Total cleared area is approx 28 acres. |
|
|
|
|
|
|
|
|
|
|
|
|
Narrow trails are widened into ranch roads which will be graveled. |
|
|
|
|
|
|
|
|
|
|
|
|
What was once a narrow trail is transformed into a 60' wide ranch road as the lake project nears completion. |
|
|
|
|
|
|
|
|
|
|
|
|
The final grading of the road. Shoulders are shaped after topsoil is added and the area is seeded. |
|
|
|
|
|
|
|
|
|
|
|
|
|
February 2010 - The large lake begins to fill from the winter rains. |
|
|
|
|
|
|
|
|
|
|
|
|
February 2010 -- Final grading is done and the area needs to be seeded. |
|
|
|
|
|
|
|
|
|
|
|
|
February 2010 -- Looking across the partially filled lake to the future homesite. |
|
|
|
|
|
|
|
|
|
|