Soilmovers LLC

       Trophy Fishing Lakes

Home
Up
North Texas Triple Lake
Central TX Lake
Infrastructure & Lake
Brenham Lake Cons.
Oakwood Trophy Lake
S.S. Lake Improvement
Coleman Lake Liner
Huntsville Project
Hamilton Project
Graford Multi Use
Canton Project
Cleburne Lake Project
Wetlands Project
Lake Liner Project
Lake Renovation Job
Lake Renovation 06
Runway Project 06
2005 Projects

 

  • Recreation Pond Construction
  • Fishing Lake Construction
  • Lake Liner Construction
  • Wetlands Improvement

 

 

Lake Renovation Job

Lake Renovation Project - North Texas

The Project was completed in 3 phases.

Phase 1 - Renovation of the original lake. The average overall depth was 2 feet. Fixed the leaking dam and dug out
the shallow areas. Landscaped the banks and added fish structure on the bottom.

(Click the pictures for a full sized version.)

Phase 2 - Construction of a new, larger lake just to the south of the old lake.
Phase 3 - Connecting the two lakes.
Finished Lake Renovation Project
Stocking the Renovated Lake
Aerials of Lake- October 2006
Aerial of Lake - July 2007