|
|
|
Aerial view - the large rectangular area on the left was where we 'borrowed' red sand to improve the access road into the property.
|
|
|
|
The Base Camp. To improve efficiency, we lived onsite due to the remote location.
|
|
|
|
Notice the plastic water tank by the utility pole. There is no ground water in this area and water for our personal use was trucked in from Graford.
|
|
|
|
|
The first step for any lake project is a series of test holes to determine soil type and percolation.
|
|
|
|
The existing pond on the property was old, inadequate and ugly. The water was desperately needed for the stock and was drained into a new area.
|
|
|
|
Draining the old pond
|
|
|
|
|
|
The water was saved from the old pond. There is no ground water in this area and stock tanks are the only source of livestock water.
|
|
|
|
|
|
The new holding tank for the existing water. The old pond will be renovated and included in the showcase lake.
|
|
|
|
|
|
|
|
|
Servicing and fueling equipment at day's end.
|
|
|
|
|