Cleburne Lake Renovation Project - Texas  Fall 2006

Lake Renovation near Cleburne, Texas
August – December 2006

The landowner was unhappy with the depth of his lake. During periods of drought, strips of land were visible across the lake. During our preliminary inspection, it was discovered the average depth was only 4 feet.

With livestock on the premises and reaching the second year of drought conditions, the owner was concerned about losing all of the existing water for construction to begin.

With that in mind, we dug two very deep areas to drain the water into. These areas would eventually tie into the new lake. The rest of the water was released thru the dam where it discharged down a draw.

With the dry weather, the original lake bed dried up fairly quickly and the major lake construction began in November and finished in December. Fortunately for all of us, the rains held off until the holidays and the lake filled up rather quickly. The winter grasses are established preventing erosion.

 


(Click on the smaller pictures to enlarge them. Use the arrows on each side to view more pictures. This may NOT display correctly in the Firefox Browser)

August

Lake inspection

August

Lake inspection

September

Digging holes to save drained water

September

Digging holes to save drained water

September

Checking depth at 16'

September

Adding fish structure

September

Drain into new area

September

September

September

September

Another area to “save” drained water

September

Added structure

September

Ready to release water

September

Filling

September

Filled

September

Cut dam to release remaining water

September

Water flowing through cut dam

September

October

Drying out

October

Digging test holes

November

Dry enough to start lake

November

November

November

Fish highways

November

Building character points/peninsulas

December

December

December

Areas constructed to catch rain water

January 2007

Winter grass growing

January 2007

Almost full

The "Before" aerial view

The "After" aerial view - February 2008

Notice the silt pond in the very upper left corner. It keeps the main lake clearer and cleaner.

Lake full - February 2008

February 2008