Alvarado Lake Renovation Project - Texas  Fall 2006

The Project was completed in 3 phases.

Phase 1 - Renovation of the original lake. The average overall depth was 2 feet. Fixed the leaking dam and dug out
the shallow areas. Landscaped the banks and added fish structure on the bottom.

(Click the pictures for a full sized version.)

Phase 2 - Construction of a new, larger lake just to the south of the old lake.
Phase 3 - Connecting the two lakes.
Finished Lake Renovation Project
Stocking the Renovated Lake
Aerials of Lake- October 2006